Press Releases

Donaboròw wind farm
09.11.2022

ABO Wind connects first wind farm in Poland to the grid

For the first time ABO Wind has connected a wind farm in Poland to the grid. The nine Siemens Gamesa SG114 turbines have a total output of 20 megawatts and supply as much green electricity as around 15,000 households consume. Read more >
ABO Wind opens new GB office
25.10.2022

International renewable energy firm ABO Wind opens new GB office

Leading international renewable energy developer ABO Wind has established a full-time presence in England with the opening of its new office in Slough, Berkshire. Read more >
battery project in Northern Ireland
19.10.2022

ABO Wind commissions its first stand-alone battery storage system

Battery storage plays a crucial role in the energy transition. In addition to the planning and construction of wind and solar farms, Germany-based ABO Wind set up a specialist department for this business segment at an early stage. With the commissioning of the first large stand-alone battery project in Northern Ireland, the company has reached an important milestone. Read more >
solar projects in South Africa
14.09.2022

ABO Wind sells two 100 MW solar projects in South Africa

The Wiesbaden-based project developer ABO Wind has sold the project rights to two photovoltaic solar farms in South Africa, each with a capacity of 100 megawatts. Read more >
08.09.2022

ABO Wind places promissory notes with a volume of 70 million euros

ABO Wind has successfully placed a promissory note loan with a volume of 70 million euros which enables the company to grow further. Read more >

 

Press Releases Archive

2021  |  2020  |  2019  |  2018  |  2017  |  2016  |  2015  |  2014  |  2013  |  2012  |  2011  |  2010  |  2009  |  2008  |  2007 |  2006  |  2005  |  2004  |  2003  |  2002

Contact

Alexander Koffka

Alexander Koffka

Tel. +49 611 267 65-515
Fax +49 611 267 65-599
presse(at)abo-wind.de

Related Topics